Skip to content
Friday, November 20, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Rudder

Posted on February 16, 2008July 22, 2008 by Glenn

Finish rudder RR#1.

2.03 Hours

Posted in Empennage

Post navigation

Previous: Rudder Spar
Next: Sheet Rack

Related Posts

  • Empennage

Rudder nose rib

  • Glenn
  • January 27, 2008
  • 0

Continued and made two more rudder nose ribs until I finished with one I was happy with. 2.58 hours.

  • Empennage

Rudder Tip Rib

  • Glenn
  • January 27, 2008
  • 0

Began forming rudder tip rib. Fully expected this would require several attempts! 3.57 hours

  • Empennage

Marking off

  • Glenn
  • December 9, 2007
  • 0

Mark off rest of sheet and cut. 2.58 hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.