These parts folded on the brake, then finished off by hand on the form block as for the Top Doubler. This is a slow process, but I have the sheet and by the time I wait for the parts to arrive I could have them built, so on I go.
5:30 hours
These parts folded on the brake, then finished off by hand on the form block as for the Top Doubler. This is a slow process, but I have the sheet and by the time I wait for the parts to arrive I could have them built, so on I go.
5:30 hours